verified connector library

ABB B23/B24 energy meter

Register map(s) for this device, each at the trust rung it earned. Addresses are 0-based as on the wire; word order and scaling are only confirmed at the hardware-verified rung.

interop-verified

Read + decoded cleanly over a real network vs an independent third-party Modbus test server (transport and framing; reads are remapped into the server's register window, so the map's own addresses are NOT exercised). Does NOT prove word order/scaling against the actual device.

pointaddress (0-based)typescaleunit
voltage_l1_n23296U32BE0.1V
voltage_l2_n23298U32BE0.1V
voltage_l3_n23300U32BE0.1V
voltage_l1_l223302U32BE0.1V
voltage_l3_l223304U32BE0.1V
voltage_l1_l323306U32BE0.1V
current_l123308U32BE0.01A
current_l223310U32BE0.01A
current_l323312U32BE0.01A
current_n23314U32BE0.01A
active_power_total23316U32BE0.01W
active_power_l123318U32BE0.01W
active_power_l223320U32BE0.01W
active_power_l323322U32BE0.01W
reactive_power_total23324U32BE0.01var
reactive_power_l123326U32BE0.01var
reactive_power_l223328U32BE0.01var
reactive_power_l323330U32BE0.01var
apparent_power_total23332U32BE0.01VA
apparent_power_l123334U32BE0.01VA
apparent_power_l223336U32BE0.01VA
apparent_power_l323338U32BE0.01VA
frequency23340U160.01Hz
power_factor_total23354I160.001

link settings as documented (unverified): RTU; baud 1200/2400/4800/9600/19200/38400/57600/115200; FC 03,06,16; Modbus protocol is specified in its entirety in Modbus Application Protocol Specification V1.1b.

⚠ Warning – Electrical equipment should only be installed, accessed, serviced and maintained by qualified electrical personnel. Working with high voltage is potentially lethal. — Starkest reads only; we never write a control register.

bench facts as documented (unverified)
terminalsTerminal wire area 1-25 mm2 for B23 direct, 0.5-10 mm2 for B24 transformer. Terminal wire area 0.5-1 mm2 for inputs/outputs/comms.
A/B polarityInputs/outputs are polarity independent
isolationInputs/outputs are built with optocouplers and are galvanically isolated from other meter electronics.
wiring notesRecommended tightening torque: 3 Nm for B23 direct, 1.5 Nm for B24 transformer, 0.25 Nm for inputs/outputs/comms.
max registers/read125
broadcastsupported
sentinel valuesUnused registers return FFFF for unsigned, or highest possible value (e.g. 7FFF, 7FFFFFFF) for signed.
protocol notesWriting to registers is only permitted to the registers listed as writable. Attempting to write to a register that is listed as writable but that is not supported by the meter will not result in an error indication.
model register8960
serial register8900
firmware register8908
identification notesModbus mapping version is at register 8910.
FC 43 device IDnot supported
powerPower dissipation voltage circuits: 1.6 VA (0.7 W) total. Power dissipation current circuits: 0.007 VA (0.007 W) per phase at 230 VAC and Ib.
environmentOperating temperature: -40°C to +70°C. Storage temperature: -40°C to +85°C. Humidity: 75% yearly average, 95% on 30 days/year. IP 20 on terminal block without protective enclosure and IP 51 in protective enclosure.
accuracyB23: Accuracy Class B (Cl. 1) and Reactive Cl. 2. Active energy 1%. B24: Accuracy Class B (Cl. 1) or C (Cl. 0,5 S) and Reactive Cl. 2. Active energy 0.5%, 1%.
certificationsMeasuring Instrument Directive (2004/22/EC) Class M1 and Class E2. IEC 60529, IEC 62052-11, IEC 62053-21, IEC 62053-23, GB/T 17215.211-2006, GB/T 17215.321-2008, GB 4208-2008, EN 50470-1, EN 50470-3.
doc revisionA

generated by gemini:gemini-3.5-flash · harvested from https://library.e.abb.com/public/6d7783fdb45ace75c1257c3f00474022/B23_B24_User_Manual.pdf.pdf (ABB); manual-faithful — the document's claims, panel risk: ELEVATED — panel is not confident; proved interop-verified on 2026-06-10 · recorded 2026-06-10

The trust ladder

Each rung states what it proved and what it did not. Gray until proven; green is earned by hardware only.

Have a device that isn't here? Upload its register map — generation is free, and the connector earns its rung by being proven, not claimed.

Need it proven on your own device? Hardware verification — if it doesn't verify, you don't pay.

Building a platform? License the verified library — machine-readable maps, firmware matrix, API access.