verified connector library

eTactica Power Meter EM

Register map(s) for this device, each at the trust rung it earned. Addresses are 0-based as on the wire; word order and scaling are only confirmed at the hardware-verified rung.

interop-verified

Read + decoded cleanly over a real network vs an independent third-party Modbus test server (transport and framing; reads are remapped into the server's register window, so the map's own addresses are NOT exercised). Does NOT prove word order/scaling against the actual device.

pointaddress (0-based)typescaleunit
cpu_temperature_common8206I160.010.01°C
frequency8207U160.001mHz
current_phase_18208U32BE0.001mA
current_phase_28210U32BE0.001mA
current_phase_38212U32BE0.001mA
voltage_phase_18214U32BE0.001mV
voltage_phase_28216U32BE0.001mV
voltage_phase_38218U32BE0.001mV
power_factor_phase_18222I160.01
power_factor_phase_28223I160.01
power_factor_phase_38224I160.01
status8225U161
nominal_full_scale_amperage8226U161A
cpu_temperature_em28448I160.010.01°C
rms_voltage_phase_1_1s8457U32BE0.001mV
rms_voltage_phase_2_1s8459U32BE0.001mV
rms_voltage_phase_3_1s8461U32BE0.001mV
rms_current_phase_1_1s8463U32BE0.001mA
rms_current_phase_2_1s8465U32BE0.001mA
rms_current_phase_3_1s8467U32BE0.001mA
power_factor_phase_1_1s8469I160.0001
power_factor_phase_2_1s8470I160.0001
power_factor_phase_3_1s8471I160.0001
frequency_em28472U160.001mHz
rms_voltage_phase_1_60s8521U32BE0.001mV
rms_voltage_phase_2_60s8523U32BE0.001mV
rms_voltage_phase_3_60s8525U32BE0.001mV
rms_current_phase_1_60s8527U32BE0.001mA
rms_current_phase_2_60s8529U32BE0.001mA
rms_current_phase_3_60s8531U32BE0.001mA
power_factor_phase_1_60s8533I160.0001
power_factor_phase_2_60s8534I160.0001
power_factor_phase_3_60s8535I160.0001
rms_voltage_phase_1_last_cycle8536U32BE0.001mV
rms_voltage_phase_2_last_cycle8538U32BE0.001mV
rms_voltage_phase_3_last_cycle8540U32BE0.001mV
rms_current_phase_1_last_cycle8542U32BE0.001mA
rms_current_phase_2_last_cycle8544U32BE0.001mA
rms_current_phase_3_last_cycle8546U32BE0.001mA
power_factor_phase_1_latest8548I160.0001
power_factor_phase_2_latest8549I160.0001
power_factor_phase_3_latest8550I160.0001
sign_power_factor_phase_18551I161
sign_power_factor_phase_28552I161
sign_power_factor_phase_38553I161

link settings as documented (unverified): RTU; default 19200 8E1; FC 03,16; RS485 half-duplex. Default settings: 19200 baud, 8 data bits, Even parity, 1 stop bit. Configurable in firmware 3.2 or higher.

bench facts as documented (unverified)
terminalsRS485 half-duplex
wiring notesEM-SC uses split-core current sensors, EM-FC uses flexible-coil current sensors
response timeout4 ms
protocol notesTypically, the device will respond in 3-4 milliseconds. There is no limit on back to back requests.
model register0x2001
serial register0x2003
firmware register0x2002
doc revision2.1
firmware applicabilityEM2 extended registers require firmware version 4.0 or greater. Serial settings configurable in firmware 3.2 or higher.

generated by gemini:gemini-3.5-flash · harvested from https://downloads.innon.com/hubfs/downloads.innon.com/eTactica/Power%20Meter%20EM/Manuals/eTactica_Power_Meter_EM_EB_Modbus_register_map_0200_Manual.pdf (eTactica); manual-faithful — the document's claims, panel risk: ELEVATED — panel is not confident; proved interop-verified on 2026-06-10 · recorded 2026-06-10

The trust ladder

Each rung states what it proved and what it did not. Gray until proven; green is earned by hardware only.

Have a device that isn't here? Upload its register map — generation is free, and the connector earns its rung by being proven, not claimed.

Need it proven on your own device? Hardware verification — if it doesn't verify, you don't pay.

Building a platform? License the verified library — machine-readable maps, firmware matrix, API access.